[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"advisory-92":3},{"id":4,"title":5,"description":6,"dateShort":7,"dateLong":8,"year":9},92,"Two Upcoming Roosevelt Island Tram Overhaul Projects in 2027","Dear Roosevelt Island Community:\n \nOur Tram operator, Leitner-POMA, will undertake two major maintenance projects on the Roosevelt Island Tramway in 2027. The projects, a comprehensive brake and carriage overhaul and a track rope repositioning overhaul, are necessary to maintain the Tram's long-term reliability and ensure it continues to operate safely.\n \nWhile there is no ideal time to undertake work that affects Tram service, these projects have been scheduled during periods of historically lower ridership and, where possible, to minimize disruptions to the school year and residents' daily commutes.\n \nDuring both projects, one Tram cabin will remain in service, with departures every 15 minutes. Residents are encouraged to plan accordingly and allow additional travel time.\n \n \nBrake and Carriage Overhaul: January 2 – February 26, 2027\n \nBeginning January 2, the Tram will undergo a comprehensive brake and carriage overhaul, which is required approximately every five years. \n \nThis extensive project will involve disassembling each carriage and evaluating its components through non-destructive testing to determine which parts can be returned to service and which require replacement. Critical systems, including the cable clamp assemblies, will be rebuilt. The bullwheel brake system will also be fully disassembled, fitted with new linings and reassembled before undergoing rigorous load testing to verify that it meets all operational and safety standards. During this project, one Tram cabin will remain in service, with departures every 15 minutes.\n \n\nTrack Rope Repositioning Overhaul: Late Spring\u002FSummer 2027\n \nThe Tram will undergo a track rope repositioning overhaul, a procedure required by the Original Equipment Manufacturer (OEM) maintenance manual, which specifies that this procedure be performed every eight years. \n\n \nDuring this work, platform routes on the Manhattan and Roosevelt Island Station will be rerouted. In addition, on Roosevelt Island, cables will be anchored in the lawn to maintain proper tension, and a perimeter fence will be installed around most of the lawn. During this project, one Tram cabin will remain in service, with departures every 15 minutes. Further information about this project, including definitive timing, will be shared at a later date. \n \n ","Nov 21","Saturday, November 21, 2026",2026]